Nirmal Wires
-
Objective
The project aimed to construct a 2,427 sq. mtr. Wire Manufacturing Unit for Nirmal Wires in Deulti, Howrah, West Bengal. The facility was designed in accordance with a 3D architectural blueprint, ensuring optimal space utilization, durability, and operational efficiency.
-
Challenges
The project posed several challenges, including:
- Strict completion timelines, requiring seamless coordination between design, procurement, and erection teams.
- Timely material availability to prevent construction delays.
- Deploying the erection contractor on schedule, ensuring an uninterrupted workflow.
- Maintaining stringent quality standards while adhering to technical specifications.
-
Solutions
Utkarsh India successfully overcame these challenges by:
- Structured Project Execution: Followed a well-defined workflow, from initial proposal and design finalisation to fabrication and erection.
- Optimised Supply Chain & Logistics: Ensured timely material procurement and dispatch to maintain project momentum.
- Precision Manufacturing & Quality Control: Conducted multi-stage inspections, ensuring compliance with industry standards and client requirements.
- Workforce Allocation & On-Site Supervision: Deployed 850 skilled workers under expert supervision to ensure on-time project completion.
-
Conclution
Utkarsh India successfully delivered a high-quality Pre-Engineered Building (PEB) within the stipulated timeframe, ensuring structural integrity, durability, and seamless execution. By meeting all client requirements without delays, we reinforced our position as a leading player in industrial infrastructure development.