Powerguru – Kharagpur Division, South Eastern Railway
-
Objective
The project aimed to support the Kharagpur Division of South Eastern Railway in achieving its 3000 MT loading target through railway electrification. The supply of mast, TTC, portal, and SPS structures played a crucial role in the upgradation of the electric traction system from 1x25 KV to 2x25 KV, ensuring enhanced railway efficiency and capacity.
-
Challenges
This large-scale railway electrification project posed several challenges, including:
- Delivering electrification structures within the required timeframe to align with the railway’s operational goals.
- Ensuring compliance with IS2062/E250 standards for mast, TTC, portal, and SPS structures.
- Managing electrification across an area of 178.50 TKM, requiring precise execution and logistics coordination.
-
Solutions
Utkarsh India effectively tackled these challenges through:
- Precision Engineering: Manufactured mast, TTC, portal, and SPS structures conforming to IS2062/E250 standards, ensuring reliability and structural strength.
- Efficient Supply Chain Management: Coordinated production schedules and optimised logistics to ensure timely delivery of electrification components.
- Stringent Quality Control: Conducted multiple inspections at each stage of production to meet railway electrification safety and performance standards.
-
Conclution
Utkarsh India successfully supplied mast, TTC, portal, and SPS structures for the Kharagpur Division railway electrification project, contributing to the upgradation of the electric traction system from 1x25 KV to 2x25 KV. This project reinforced our reputation as a trusted partner in railway electrification, playing a key role in supporting South Eastern Railway’s growth and efficiency.