Shiv Kumar Singh – Chopan Section, CAR-CPU Doubling Project, PRYJ Division, NCR
-
Objective
The project involved supplying mast, TTC, portal, and SPS structures for railway electrification in the Chopan Section, as part of the doubling of the CAR-CPU section in the PRYJ Division of North Central Railway (NCR). The 25 KV AC electrification system was implemented to enhance railway capacity and operational efficiency.
-
Challenges
This electrification project posed multiple challenges, including:
- Strict delivery timelines to ensure uninterrupted railway operations.
- Compliance with IS2062/E250 technical standards for mast, TTC, portal, and SPS structures.
- Executing railway electrification over 168.20 KM and 142.00 KM, requiring efficient material supply chain management.
-
Solutions
Utkarsh India successfully navigated these challenges by implementing:
- Precision Engineering: Manufactured mast, TTC, portal, and SPS structures adhering to IS2062/E250 standards, ensuring high durability and reliability.
- Efficient Logistics Management: Streamlined production and transportation schedules to enable timely delivery of the required materials.
- Comprehensive Quality Control: Conducted multi-stage inspections to ensure compliance with railway electrification safety regulations.
-
Conclution
Utkarsh India played a key role in electrifying the Chopan Section, supplying high-quality mast, TTC, portal, and SPS structures for the CAR-CPU doubling project. Our contribution reinforced our expertise in delivering top-tier railway electrification solutions, supporting the expansion of India’s railway network.