Shiv Kumar Singh – Chunar to Lusa Section, CAR-CPU Doubling Project, PRYJ Division, NCR

  • Objective

    The project involved supplying mast, TTC, portal, and SPS structures for railway electrification in the Chunar to Lusa section, as part of the doubling of the CAR-CPU section in the PRYJ Division of North Central Railway (NCR). The objective was to implement 25 KV AC electrification to enhance railway operations and improve network capacity.

  • animation-w4Challenges

    This railway electrification project posed significant challenges, including:

    • Meeting strict delivery schedules to align with the railway’s expansion timeline.
    • Adhering to IS2062/E250 technical standards for mast, TTC, portal, and SPS structures.
    • Managing electrification over 243.00 KM and 202.57 KM, requiring precise coordination of production, supply, and logistics.

  • Solutions

    Utkarsh India successfully tackled these challenges by:

    • Precision Manufacturing: Produced mast, TTC, portal, and SPS structures in compliance with IS2062/E250 standards, ensuring durability and structural integrity.
    • Streamlined Logistics and Execution: Optimised production schedules and transportation to ensure on-time delivery of all electrification components.
    • Stringent Quality Control: Conducted multi-stage inspections to maintain railway safety standards and ensure compliance with electrification regulations.

  • animation-w4Conclution

    Utkarsh India successfully contributed to the electrification of the Chunar to Lusa section, supplying mast, TTC, portal, and SPS structures for the CAR-CPU doubling project. This project reinforced our ability to deliver large-scale railway electrification solutions, ensuring the seamless expansion of India’s railway network.