SKS-UBC (JV) – BBK-GKC Section of HDN Route, LJN Division, NER

  • Objective

    The project involved supplying mast and SPS structures for railway electrification in the BBK-GKC section of the HDN route within the LJN division of North Eastern Railway (NER). The implementation of the 2x25 KV traction system was designed to upgrade the railway’s capacity and improve operational efficiency.

  • animation-w4Challenges

    This large-scale electrification project posed several challenges, including:

    • Ensuring timely delivery of electrification structures to maintain uninterrupted project progress.
    • Meeting IS2062/E250 technical specifications for mast and SPS structures.
    • Executing electrification over an extensive area of 235 RKM/620 TKM, requiring efficient planning and supply chain management.

  • Solutions

    Utkarsh India successfully navigated these challenges through:

    • High-Precision Manufacturing: Engineered and produced mast and SPS structuresadhering to IS2062/E250 standards, ensuring strength and durability.
    • Efficient Logistics: Streamlined production and delivery schedules to meet the strict project deadlines, ensuring timely execution.
    • Comprehensive Quality Control: Conducted multi-level inspections to uphold railway safety and performance standards.

  • animation-w4Conclution

    By supplying mast and SPS structures for the BBK-GKC section electrification project, Utkarsh India played a vital role in improving railway infrastructure in the LJN division of NER. Our commitment to quality, precision, and on-time delivery reinforced our reputation as a trusted partner in railway electrification projects supporting India’s growing rail network.