SKS-UBC (JV) – GKC-CHPG Section of HDN Route, BSB Division, NER

  • Objective

    The project aimed to supply mast and SPS structures for railway electrification in the GKC-CHPG section of the HDN route within the BSB division of North Eastern Railway (NER) . The 2x25 KV traction system was implemented to enhance the railway’s capacity and efficiency.

  • animation-w4Challenges

    The project presented key challenges, including:

    • Strict delivery timelines to ensure the electrification work progressed without delays.
    • Adhering to IS2062/E250 technical specifications for masts and SPS structures.
    • Covering a large electrification area of 179 RKM/443.31 TKM, requiring efficient planning and execution.

  • Solutions

    Utkarsh India successfully addressed these challenges by:

    • Precision Manufacturing: Produced mast and SPS structures in compliance with IS2062/E250 standards, ensuring durability and structural integrity.
    • Timely Execution: Coordinated production and logistics to deliver the required materials on schedule,aligning with the railway’s project timeline.
    • Quality Assurance: Conducted rigorous quality checks at multiple stages, ensuring that all structures met railway electrification safety and performance standards.

  • animation-w4Conclution

    Utkarsh India played a crucial role in the successful electrification of the GKC-CHPG section in the BSB division of NER. By delivering high-quality mast and SPS structureswithin the required timeframe, we reinforced our position as a trusted partner for railway electrification projects, contributing to enhanced railway infrastructure and operational efficiency.