Waaree Renewable Technologies Limited

  • Objective

    The project aimed to supply and install Column Posts at Bikaner, Rajasthan, facilitating solar power generation, utilization, and EV charging infrastructure. This initiative was critical in supporting large-scale renewable energy projects in Rajasthan, a key solar energy hub in India.

  • animation-w4Challenges

    The project posed key challenges, including:

    • Strict delivery timelines, requiring the supply of 734 MT of Column Post structures within 45 days.
    • Ensuring technical compliance, particularly with HR Coil material in 2MM thickness.
    • Coordinating logistics, ensuring timely delivery, adherence to quality standards, and the inclusion of Material Test Certificates (MTC) along with the vehicle.

  • Solutions

    Utkarsh India successfully addressed these challenges by:

    • Precision Manufacturing: Produced high-quality Column Posts using HR Coil, ensuring structural durability and long-term efficiency.
    • Optimised Supply Chain & Logistics: Streamlined production and transportation to ensure timely delivery within the 45-day deadline.
    • Rigorous Quality Control: Conducted multi-stage inspections, ensuring all components met industry and client specifications.
    • Expert Workforce Deployment: Assigned skilled professionals for fabrication, quality checks, and on-site coordination, ensuring seamless execution.

  • animation-w4Conclution

    Utkarsh India successfully delivered solar structures for Waaree Renewable Technologies Limited, playing a key role in Bikaner’s solar power expansion. This project reinforced our expertise in high-quality solar infrastructure solutions, contributing to India’s clean energy goals.